958 Grilse Lane BC

Sunday, January 7, 2018

Living Room Clean Up

Living room ceiling cleaned up, new drywall and skim coat on dropped ceiling and beam encased,  light fixture now fits totally on the beam. Jan 2018



Posted by Unknown at 5:23 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About Me

Unknown
View my complete profile

Blog Archive

  • ▼  2018 (16)
    • ▼  January (16)
      • Wood
      • Visitors
      • Teal Bathroom
      • Sewing Room
      • Rodent control
      • Restoring pathways to fireplace room and living room
      • Master Bedroom Ensuite Bathroom
      • Master Bedroom
      • Living Room Clean Up
      • Laundry Room - insulated ceiling - floor of master...
      • Kitchen clean up
      • Foyer Dec 2017
      • First Christmas 2017
      • Crawl Space - insulated ceiling
      • Basement Suite cleaned out over 5 trucks of garbag...
      • Insulating basement ceiling (floor of master bedro...
  • ►  2017 (26)
    • ►  December (7)
    • ►  November (8)
    • ►  October (10)
    • ►  September (1)
Simple theme. Powered by Blogger.