958 Grilse Lane BC

Sunday, January 7, 2018

Master Bedroom

Master bedroom  - Lars leveled the floor, keeping the slopping floor intact - slope was for drainage when the space was an outdoor porch.










Posted by Unknown at 5:30 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About Me

Unknown
View my complete profile

Blog Archive

  • ▼  2018 (16)
    • ▼  January (16)
      • Wood
      • Visitors
      • Teal Bathroom
      • Sewing Room
      • Rodent control
      • Restoring pathways to fireplace room and living room
      • Master Bedroom Ensuite Bathroom
      • Master Bedroom
      • Living Room Clean Up
      • Laundry Room - insulated ceiling - floor of master...
      • Kitchen clean up
      • Foyer Dec 2017
      • First Christmas 2017
      • Crawl Space - insulated ceiling
      • Basement Suite cleaned out over 5 trucks of garbag...
      • Insulating basement ceiling (floor of master bedro...
  • ►  2017 (26)
    • ►  December (7)
    • ►  November (8)
    • ►  October (10)
    • ►  September (1)
Simple theme. Powered by Blogger.